This mini ramp is 3ft. Tall (from the ground to the top of the deck), 8ft. Vast and 24"-0 from end to finish (including each deck).As with all structures below on julianum.net, you can develop this mini ramp any size you want. However, for the product list to be accurate, friend will need to follow the plan as listed below.Keep in mind the this ramps dimensions were not liked at random. I invested weeks engineering a ramp that would certainly be cost and material efficient, funny to ride and most important, sturdy and safe.

You are watching: How much does it cost to build a mini ramp


whereby TO gain SUPPLIES

The wood and also hardware deserve to be found at most home advancement stores. Occasionally you can find the stole there as well, I understand my local residence Depot tote the coping and threshold material.If not, you can search the net for steel fabricators or salvage steel. Personally, I"ve begun buying my steel from MetalsDepot.com due to the fact that of their an extremely quick shipping and good prices. I"m no affiliated with them in any type of way, I just like them and their product.If this ramp is going to stay outside, it requirements to be safeguarded from the elements. A great place to begin is with push treated lumber, paint and a tarp. You might want come invest in a composite product for the surface too. Such as Skate Lite or Ramp Armor.Be extra mindful when working with treated wood though, the chemicals offered to act the hardwood contain a poisonous pesticide.


products needed 53 - 2x4"s, 8" long 4 - 4x8, 3/4" plywood 10 - 4x8, 3/8" plywood 5 - 4x8, 1/4" masonite 1 - 2 3/8" x 16" stole pipe 1 - 25lb Box, 1 5/8" screws 1 - 25lb Box, 2 1/2" screws 8 - clothesline bolts Tools required Tape measure up & PencilHammer and clampsCombination squareDrill w/ Drill BitsCircular & jig sawChalk LineFriend

Approximate Cost: $500Easy | | | | | an overwhelming


picking A location FOR your MINI RAMP

Ideally, a level driveway or concrete pad would certainly be the best spot for her mini ramp. But ramps often tend to gain pretty big and backyards and also fields become the only place big enough for them.If you"re placing your mini ramp top top terra firma (earth) you"ll have to make footings, or pads that the half pipe will sit on. You have the right to do this comparable to the method you develop a deck because that a house, through concrete blocks.I"ve created a separate page on ramp foundations, due to the fact that it"s an ext than can be spanned in a paragraph.


build IT

Below is a reduced list to express what you will need and it"s size.

*


shift LAYOUT diagram

Gather two sheets the 3/4" plywood because that the next templates. One sheet of 3/4" ply will carry out two sides.

*
usage CDX or better grade plywood. Particle board is no acceptable for any kind of skate structure, period.

CUT THE TRANSITION

through a jig saw, very carefully cut on the lines you attracted for the transition. When cut, you have the right to use this as your template to trace the 3 remaining transition sides.You"ll only require two 3/4" sides for each 8" ramp section. Most ramps room made in 4" sections yet this ramp is tiny enough to obtain away v an 8" span. Reduced the templates and collection them aside.


drawing THE transition

Take one 8" long 2x4 and on one end, drill a hole the diameter the a pencil (about 3/8"). Then measure up from the feet you just drilled, the size of the shift radius. In this case, 6"-0. Ar a screw there but don"t go all the way through the 2x4 yet.

*
Take your 3/4" plywood and lay the on a relatively level surface. Grab one more sheet the plywood and also place it alongside the 3/4" plywood as presented below.
*
With the 2x4 girlfriend made earlier, screw the screw right into the height piece that plywood where presented above. Now you want to draw a radius using the 2x4 to guide your pencil till you have the shift radius plainly visible on the 3/4" paper of plywood.Once drawn, measure up up 2"-11 1/4 native the bottom left side. Making use of a right edge, mark this and also the notch for the coping to finish the transition. The notch because that the coping is 1 1/4" through 1 3/4".


frame THE change

Gather thirty four, 7"-10 1/2 long 2x4"s for the transition sections. Each 8" wide transition section calls for seventeen 2x4"s. This includes the deck part as well. Take 5 of those 7"-10 1/2 long 2x4"s and also start frame this ar by placing 2 2x4"s in ~ the back, one in ~ the front and also two top top the top beside the coping notch as displayed above.


*

including SUPPORTS

Place 2 2"-9 long 2x4"s under the deck 2x4"s where shown below. Use around eight, 1 5/8" screws to affix each one.These include extra assistance for the deck and also need come be inserted on every side in both change sections.


*

frame THE shift CONTINUED

Now affix twelve 7"-10 1/2 long 2x4"s, 8" on facility unless listed otherwise as shown below. Once this has been done, repeat the procedure for the 2nd transition section and set them aside because that now.The 2x4"s that space doubled in the lower section of the riding surface ar are necessary to produce a bigger surface area because that the seam of the first 3/8" plywood great to.


*

frame THE flat BOTTOM

Gather fifteen 7"-9 long 2x4"s because that the flat bottom supports. You"ll likewise need two, 8" long 2x4"s for the sides of the flat bottom section.Attach the 7"-9 long 2x4"s come the 8" long 2x4"s, 8" on center as shown below to complete the flat section.Pre drill the screw places at the end of the 2x4 through a 3/16" drill little to store the hardwood from splitting.Also, just like the transition, the 2x4"s need to be double where presented for the very first layer of 3/8" plywood.


*

put THE RAMP

Now that every one of the framing is done, the sections have the right to be attached to one another. Hope you have the ramps final location every squared far too. If no you have the right to learn an ext about ramp foundations here.Start by having a friend assist you relocate one transition section right into place. Then location the flat bottom section alongside the transition. Finally, place the last shift section alongside the level bottom section.

*
Once all of the sections space in place, make certain that they room level and also fit with each other properly. Then double check that they space fitting together correctly. After you have done this, clamp the sections with each other to make sure they aren"t walking anywhere. Ns use rapid clamps, but most any clamps will work.


ASSEMBLING THE RAMP

If her mini ramp is on a concrete slab, you can attach the shift and flat bottom sections together using 2 1/2" screws. Screw them with each other from each side that the bottom with around six screws every side.

*
If you space placing your ramp ~ above footings or concrete blocks, drill 4 equally spaced 5/8" holes. Currently bolt the sections together using four 1/2" bolts through nuts and washers per side, as displayed below.
*


buying THE transaction

*
To discover the steel, look up "steel yards", "structural steel" or "steel fabricators" and so on in the call book.The actual size of the steel pipe the you are in search of is 2 3/8" (60.33mm) exterior diameter. Through a wall surface thickness the 7/32". This pipeline is well-known by steel shops as...2" OD, Schedule 80, black color steel pipeSome steel shops room picky around what it"s referred to as so use the above name if they it seems to be ~ confused. Girlfriend can also use schedule 40 steel pipe (5/32" wall) together it is cheaper and lighter, yet it may end up being dented. Schedule 80 pipe on the other hand will no dent under normal skateboarding use.Do not usage PVC pipe (plastic) or electric conduit, if you want it to last.


CUTTING and DRILLING THE transaction

*
cut your steel pipe into two pieces at 8" lengthy with a stole cutting blade (carbide blade) and also miter witnessed or one saw.Now we require to connect the stole coping come the ramp. I am going come cover two of the most common methods.The first method gift screws. If done properly, screws will hold the coping secure for the life of her ramp. Also, friend will seldom if ever an alert the feet while skating the ramp.Start by noting the pipe about 3" in indigenous the ends and then around every two feet in between. Now drill a 3/8" top top the outside and also a 3/16" feet on the within of the pipe.


attach THE transaction W/ SCREWS

when drilled, place the transaction in the notch ~ above the mini ramp. Revolve the pipeline so that the screws will certainly hit the 2x4 close come the center. Now location the screws in the holes and screw the pipe under snug.

*
After you"re done, go ago with a screwdriver and also make sure the screws room screwed down tight.


connect THE coping W/ BOLTS

*
To attach the transaction to the mini ramp through bolts, friend will have to drill feet in the 2x4 behind whereby the coping will sit. Mark the 2x4 around an 1 1/2" down from the top, 6" in from every end. Likewise mark two in the middle at 2"-4 apart. Drill a 3/8" feet in each significant location at a slight bottom angle.Once the 2x4 has been drilled, location the coping in the notch top top the mini ramp. Usage the previously drilled holes to note the coping. Eliminate the coping and also drill the 3/8" holes whereby you have actually just indicated.Feed a hook bolt into the feet you drilled and also place the transaction in the notch top top the mini ramp, if lining increase the bolts v the holes in the 2x4. Tighten the bolts under secure to the 2x4 making use of nuts and also washers.The bolt at the bottom of the illustration on the right is also known as a clothesline hook and also is the most typical for this application. However, hook bolts come in a variety a shapes and sizes. You have the right to use almost any of lock as lengthy as they are about 3" in length and have a 3/8" diameter.


spanning THE DECKS

now that you have actually the coping every taken treatment of, it"s time to cover her ramp. Begin with the decks.Cut 2 sheets that 3/4" plywood under to 2"-9 wide. Connect a sheet to each deck section of the ramp with 1 5/8" screws. Room the screws about a foot except each other on the studs below.

*
You have to hit the 2x4 supports with the screws. A great way to attain this is v a chalkline or directly edge and pencil. Use the screws top top the political parties of the ramp as guides for the 2x4 supports.

second LAYER that PLYWOOD

on the 2nd layer, friend don"t want the plywood seams to be in the same place as the bottom layer. So reduced a paper of 3/8" plywood in fifty percent and connect it come the ramp the same method as the others.

*
Keep adding full sheets till you with the other side and the coping. Cut the critical ply come fit if necessary.


covering THE RAMP

place a sheet of 3/8" plywood on the ramp. Push it flush versus the coping and begin attaching the ply with 1 5/8" screws. Start at the top and also work your method down, going from left to right favor reading a book. You might need who to aid you hold the ply in ar while you get the first couple of screws started.

*
As through the deck, note the place of the 2x4 supports and space the screws about a foot apart.Next, take one more sheet the 3/8" plywood, press it flush versus the ahead sheet and also attach that in the same method placing the screws about a foot apart.
*
Once you"ve attached the an initial two pieces, execute the same to the other side that the ramp leave the facility exposed as presented above.The idea is, girlfriend shouldn"t have actually to cut the facility sheet because that it to fit. The space should occupational out to 4 feet. However if girlfriend do have actually to reduced the sheet, it"s much less complicated to number it out right here than top top the transition.

See more: What Decimal Power Does The Abbreviation F Represent, Answered: Mass Ogam Temp


attaching THE final LAYER

begin with a full sheet that masonite and also press the flush against the coping similar to the an initial layer. Keep including sheets till you with the other side. As soon as again, cut the critical one come fit if necessary.The coping should stick out 3/8" indigenous riding surface. If it sticks out as well much, place wood shims under the masonite, near the transaction to raise the masonite. Shims are easily accessible at your neighborhood hardware store.

*
The main distinction with masonite is the you must countersink the screw hole locations before you screw the masonite down. You have the right to do this with a countersink bit, or a 3/8" drill bit and a stable hand.You likewise will need to space the masonite sheets around 1/16" to 1/8" from every other. This keeps them indigenous bubbling up as soon as they expand as result of temperature change. I use pennies to an are them.


perfect 3FT MINI RAMP

Make sure you walk over the entire ramp before skating it. The last thing you want is to take a slide and there it is in a screw still sticking out.But if you"ve made the this far, you"re the proud owner the a brand new 3" mini ramp. Congratulations ~ above your brand-new mini ramp. Enjoy!

*


EMAILS I"VE RECIEVED native READERS...

Dave & Son"Just finished building the 3" mini ramp with my 13 year old son. We live in southern new Jersey.I want to tell you that your plans and instructions are spot on. I appreciate the moment you take it to put this out there for human being like us. It took about 3 full days to finish and also ended up costing united state $800. We used pressure treated wood and needed several bags of stone to level the area we wanted to placed it.What a great experience because that the 2 of us to execute this job together!-Dave"Thanks Dave, I evaluate the feedback. Glad the plans resolved for you and also your son.Thanks again, Jason


These men from Finland determined to placed a mini ramp in your office. I don"t check out why not, hahahaThanks guys, gain your ramp!